Please be advised that CSI Asphalt Maintenance will be onsite Monday through Wednesday (August 3, 2020 through August 5, 2020) WEATHER PERMITTING, providing crack filling to the following roads:
*All association roads in Cornerstone Conservancy
*Horseshoe Drive
*Escoll Drive
*Blue Mountain Lake Dr (from Pocahontas to the mail pod)
*Mail Pod Parking Lot
While the CSI staff will provide traffic control as they move throughout the community and the crack filling material does dry within 5 minutes of the application – we ask that you please slow down and be aware that road work will be occurring. The mail-pod parking area will be closed for a short time while the crack filling is being performed. Should you arrive at the mail-pod while CSI is working, please do not enter the parking lot area.
Thank you for your cooperation and patience.